Laporan Masjid Daarul Uluum

Daftar Penerimaan Pembangunan Tempat Wudhu (Tahun 2013)

LAPORAN SEMENTARA
DAFTAR PENERIMAAN PEMBANGUNAN TEMPAT WUDHU
MASJID DARUL ULLUM TAHUN 2013
NO TANGGAL INFAQ /SUMBANGAN (Rp)
1 2-Jun-13 Bp. USTAD GATOT Rt 09 2,650,000
2 16-Jun-13 Bp Sadri/bendahara 12,000,000
3 22-Jun-13 Bp.H.indra Gama H/Keluarga RT 06 1,000,000
4 22-Jun-13 Bp.Herry Purwanto /kel RT08 2,000,000
5 23-Jun-13 Bp.Amas RT kel. 07 400,000
6 23-Jun-13 Bp. H. Sugio kel RT 08 1,000,000
7 23-Jun-13 Bp. H. Tumijo kel RT 06 1,000,000
8 23-Jun-13 Bp.Alfira kel RT 06 1,000,000
9 23-Jun-13 Bp. H. Sofyan kel RT.08 500,000
10 26-Jun-13 Bp. Bagus Abdul Hakim RT 5/B1/1 500,000
11 26-Jun-13 Bp. H. Ahmad RT 08 PAM 200,000
12 27-Jun-13 Bp H. Arbain kel RT 06 1,500,000
13 27-Jun-13 Bp Hj. Ervia Hofni 1,000,000
14 28-Jun-13 Infaq/tempat wudhu 181,000
15 1-Jul-13 wism nugraha santana/Bp.H.Agus Muslih RT 08 2,500,000
16 2-Jul-13 Iswantoro RT 08 500,000
17 2-Jul-13 Toko Dini Rahmadini /H/Hendra 1,000,000
18 2-Jul-13 Bp. Suhendi RT 08 500,000
19 2-Jul-13 Bp. Heriananto RT 08/PAM 250,000
20 2-Jul-13 Bp. Djali Juanda RT 06 150,000
21 2-Jul-13 Kotak /tromol mesjid 450,000
22 4-Jul-13 BP. Eddy Murwando RT 08 300,000
23 2-Jul-13 Bp. Taufi RT 08 300,000
24 5-Jul-13 Hamba Allah 65,000
25 5-Jul-13 Hamba Allah 50,000
26 7-Jul-13 Bp.Ambiya RT 08 pam/ 150,000
27 5-Jul-13 Bp. Andi / Peni RT 05 150,000
28 10-Jul-13 Kotak pembangunan/tempat wudhu 550,000
29 10-Jul-13 Kotak pembangunan/tempat wudhu 180,000
30 10-Jul-13 Bp. Pendi Cell 150,000
31 10-Jul-13 Hamba Allah rt 06 350,000
32 12-Jul-13 Bp. H. Muhtadi RT 08/PAM 500,000
33 12-Jul-13 Bp. H. Harta Kasnari RT 05 500,000
34 12-Jul-13 Bp. Mas.Ferdian RT 06 773,000
35 12-Jul-13 Bapak Hj. Wida RT 08 1,500,000
36 13-Jul-13 Hasil kotak pembangunan 800,000
37 13-Jul-13 Hamba Allah RT 08 150,000
38 14-Jul-13 Bapak Heru RT 08 50,000
39 14-Jul-13 Bapak Razendra UST RT 08 PAM 500,000
40 14-Jul-13 Hamba Allah RT 07 PAM 500,000
41 15-Jul-13 Hamba Allah RT 06/014 1,500,000
42 16-Jul-13 Hasil kotak pembangunan 240,000
43 16-Jul-13 Hasil Kupon Bapak Heru 860,000
44 16-Jul-13 Hamba Allah RT 07 PAM 1,000,000
45 17-Jul-13 Hasil trombol pembangunan 575,000
46 18-Jul-13 hasil kupon pak HERU 140,000
47 18-Jul-13 Hamba Allah / pada saat ikut Sholat 200,000
48 18-Jul-13 Hasil kotak pembangunan 85,000
49 19-Jul-13 Hasil kotak pembangunan 75,000
50 20-Jul-13 bapak Suhendi RT 08 1,000,000
51 20-Jul-13 Infax Bapak Edi Suryani PAM F38 RT 07 500,000
52 20-Jul-13 PT.Mayang baruna RT 06 500,000
53 20-Jul-13 dari Kotak Trombol mesjid 275,000
54 20-Jul-13 Bapak Paiman RT 08 100,000
55 20-Jul-13 Hamba Allah RT 07 150,000
56 20-Jul-13 dari Bapak Rafli RT 08 500,000
57 20-Jul-13 dari Bapak Edi RT 07 100,000
58 20-Jul-13 dari Bapak B9 no. 1 RT 07 360,000
59 21-Jul-13 Bapak Punta RT 08 PAM 1,000,000
60 21-Jul-13 Bapak Armen RT 08 PAM 1,000,000
61 21-Jul-13 Bapak Prihandi RT 08 PAM 100,000
62 21-Jul-13 Bapak Mulyono RT 08 PAM 100,000
63 21-Jul-13 Bapak Supangat RT 08 PAM 500,000
64 21-Jul-13 Bapak Syarifudin RT 08 PAM 250,000
65 21-Jul-13 dari Ibu LILIS RT 08 PAM 100,000
66 21-Jul-13 dari Ibu Siti Hawa RT )* PAM 150,000
67 22-Jul-13 dari Kotak Pembangunan mesjid 1,260,000
68 23-Jul-13 Ibu Riska Binti Tarudin RT 08 120,000
69 23-Jul-13 pengembalian sisa bayar tukang 60,000
70 23-Jul-13 Trombol Pasar malam 713,500
71 23-Jul-13 dari Kas DKM Darul Ullum 7,000,000
72 23-Jul-13 Bapak Parno RT 08 500,000
73 24-Jul-13 dari Hamba Allah RT 08 500,000
74 24-Jul-13 dari hasil Kotak Pembangunan masjid darululum 220,000
75 26-Jul-13 dari hasil Kotak Pembangunan masjid darululum 395,000
76 25-Jul-13 Sumbangan kantor Bapak Ferdian 1,420,000
77 26-Jul-13 Hasil Kupon bapak Heru RT 08 220,000
78 27-Jul-13 Kel.Bp.Muhadi Bin Abu Sofyan 500,000
79 27-Jul-13 Kotak pembangunan/tempat wudhu 400,000
80 28-Jul-13 Kotak pembangunan/tempat wudhu 285,000
81 28-Jul-13 Infaq Cucu Bp. Herry Purwanto 500,000
82 31-Jul-13 Infaq Kantor Bp. Ferdian 150,000
83 1-Aug-13 Bapak Diyono RT 08 PAM 500,000
84 1-Aug-13 Hamba Allah 200,000
85 2-Aug-13 Bapak Larno RT 08 PAM 300,000
86 2-Aug-13 infak orang tuan Bp. Sugio 300,000
87 2-Aug-13 Hamba Allah pak Afdial Rt 07 500,000
88 2-Aug-13 Infak Bp. Iswantoro RT 08 5,000,000
89 2-Aug-13 Kotak pembangunan tl 30 2 Agustus 2013 1,585,000
90 2-Aug-13 Bapak Firdaus RT 07 150,000
91 3-Aug-13 Infaq Karyawan Tip Top 650,000
92 4-Aug-13 Kotak pembangunan Mesjid 510,000
93 4-Aug-13 Infak Hamba Allah RT 07 200,000
94 6-Aug-13 Dari Bp. Ajo 150,000
95 6-Aug-13 Kotak pembangunan Mesjid 800,000
96 6-Aug-13 Keluarga Bapak Panca W 2,000,000
97 6-Aug-13 Masukan Kupon dr Bp. Taufik RT 08 500,000
98 6-Aug-13 Keluarga Bapak Erfan RT 08 PAM 500,000
99 6-Aug-13 Masukan Kupon dr Bp. Edi 720,000
100 7-Aug-13 Kotak pembangunan Mesjid 300,000
101 7-Aug-13 dari Bapak Darto 100,000
102 7-Aug-13 Infak Dr Ibu Hj . Aidar Tip Top Rawamangun 500,000
103 16-Aug-13 Kotak pembangunan Mesjid 200,000
104 18-Aug-13 Kotak pembangunan Mesjid 435,000
105 18-Aug-13 kotak Sumbangan Idulfitri 1434 H 1,380,000
106 19-Aug-13 Infak Hamba Allah RT 06 500,000
107 23-Aug-13 Kotak pembangunan Mesjid 590,000
108 24-Aug-13 Infak pak Jali Juanda RT 06 100,000
109 24-Aug-13 Kotak pembangunan Mesjid 200,000
110 26-Aug-13 Infak Hamba Allah RT 08 PAM 200,000
111 29-Aug-13 Kotak pembangunan Mesjid 273,000
112 1-Sep-13 Infaq Bapak haji Budi RT 08 1,000,000
113 1-Sep-13 Kotak pembangunan Mesjid 615,000
114 4-Sep-13 Kotak pembangunan Mesjid 140,000
115 4-Sep-13 Infaq Ibu Siti rt 08 100,000
116 6-Sep-13 Infaq Bapak Haji Helmi rt 06 175,000
117 6-Sep-13 Infaq dr Bapak Andi RT 06 100,000
118 6-Sep-13 Kotak pembangunan Mesjid 395,000
119 7-Sep-13 Kotak pembangunan Mesjid 185,000
120 9-Sep-13 Kotak Pasar Malam / Mesjid 810,000
121 9-Sep-13 Kotak pembangunan Mesjid 160,000
122 7-Sep-13 Infak dari Bapah Jali Juanda 100,000
123 12-Sep-13 Infak Bapak Bagus RT 05 500,000
124 13-Sep-13 Kotak pembangunan Mesjid 545,000
125 15-Sep-13 Infak dari RT 08 200,000
126 15-Sep-13 Kotak pembangunan Mesjid 50,000
127 15-Sep-13 Infak dari Kupon Bapak Arbain 540,000
128 16-Sep-13 Dana Pinjaman RT 06 6,000,000
129 15-Sep-13 Infak Bapak Mat Mui RT 08 PAM 500,000
130 15-Sep-13 Kotak pembangunan Mesjid 280,000
131 15-Sep-13 Kotak pembangunan Mesjid 235,000
132 15-Sep-13 Infak Bapak Taufik RT atas 3,000,000
133 15-Sep-13 Kotak pembangunan Mesjid 660,000
134 15-Sep-13 Kotak pembangunan Mesjid 256,000
135 20-Sep-13 dari Yayasan Drul Ulum (MDU) 13,000,000
136 2-Oct-13 dari Yayasan Drul Ulum (MDU)/Kramik 2,900,000
137 2-Oct-13 Infak dr Hj Ibu Wilda RT 08 1,000,000
138
139 6-Oct-13 Dari yayasan darul ulum 2,000,000
140 6-Oct-13 Kotak pembangunan Mesjid/dalam amplop RT 07 350,000
141 6-Oct-13 Kotak pembangunan Mesjid 545,000
142 9-Oct-13 Dari yayasan darul ulum 6,000,000
143 10-Oct-13 Dari yayasan darul ulum 500,000
144 11-Oct-13 dari infak lapangan/dikelola Bp. Daeng Ruslan
145 13-Oct-13 Kotak pembangunan Mesjid 235,000
146 17-Oct-13 Dari yayasan darul ulum 1,600,000
147 5-Oct-13 Kotak pembangunan Mesjid 350,000
148 26-Oct-13 Kotak pembangunan Mesjid/Rp.350.000,+Rp.310.000,-+Rp.174.000,- 834,000
149 31-Oct-13 Kotak pembangunan Mesjid/tempat wudhu 285,000
150 1-Nov-13 Kotak pembangunan Mesjid/tempat wudhu 382,000
151 1-Nov-13 INFAQ ALHIKMAH / BKN BP. SUPANGAT 1,780,000
152 8-Nov-13 Kotak pembangunan Mesjid/tempat wudhu 615,000
153 15-Nov-13 Kotak pembangunan Mesjid/tempat wudhu 542,000
154 17-Nov-13 Kotak pembangunan Mesjid/tempat wudhu 148,000
155 22-Nov-13 Kotak pembangunan Mesjid/tempat wudhu 326,000
156 25-Nov-13 Kotak pembangunan Mesjid/tempat wudhu 280,000
157 24-Nov-13 KUPON PAK H. PARNO RT 08 250,000
158 29-Nov-13 INFAQ SMP N 23 1,500,000
159 29-Nov-13 Kotak pembangunan Mesjid/tempat wudhu 500,000
160 6-Dec-13 Kotak pembangunan Mesjid/tempat wudhu 890,000
161 6-Dec-13 TERIMA DARI YAYASAN DARUL ULUM 9,071,500
162 6-Dec-13 Kotak pembangunan Mesjid/tempat wudhu 250,000
163 12-Dec-13 Kotak pembangunan Mesjid/tempat wudhu 435,000
164 13-Dec-13 Kotak pembangunan Mesjid/tempat wudhu 445,000
165 13-Dec-13 TERIMA DARI YAYASAN DARUL ULUM 2,100,000
166 13-Dec-13 PINJAM DARI H SUGIYO RT 08 3,000,000
167 16-Dec-13 PINJAM DARI H HENDRA RT 06 4,000,000
168 18-Dec-13 TERIMA DARI YAYASAN DARUL ULUM 8,500,000
169 22-Dec-13 Kotak pembangunan Mesjid/tempat wudhu 700,000
170 24-Dec-13 PINJAM DARI H SUGIYO RT 08 3,500,000
171 24-Dec-13 DITERIMA DARI DKM DARULULUM 3,500,000
172 26-Dec-13 INFAQ DARI BAPAK PANCA RT 06 1,500,000
173 26-Dec-13 Kotak pembangunan Mesjid/tempat wudhu 465,000
174 26-Dec-13 Kotak pembangunan Mesjid/tempat wudhu 420,000
175 29-Dec-13 INFAQ DR GANISA HAFI/ANAK USTD GATOT SUJONO 1,000,000
176 29-Dec-13 INFAQ DR BP BAGUS ABDUL HAKIM RT 06 500,000
177
178
179
180
181
182
sub total Penerimaan 175,490,000
1 31-Dec-13 tgl 31 Desember 2013 Saldo GIRO di bank Muamalat (terlampir) 1,000,000
total Penerimaan 176,490,000
total pengeluaran/Penggunaan 167,851,500
8,638,500
BENDAHARA MESJID DARUL ULLUM
TTD

Daftar Pengeluaran Pembangunan Tempat Wudhu (Tahun 2013)

LAPORAN SEMENTARA
DAFTAR PENGELUARAN PEMBANGUNAN TEMPAT WUDHU
MASJID DARUL ULLUM TAHUN 2013
NO TANGGAL BIAYA/ PENGGUNAAN (Rp)
1 4-Jun-13 ongkos tukang 1,650,000
2 4-Jun-13 buka rekening bank 1,000,000
3 17-Jun-13 beli besi slop/30 bt/cicin 300/gergaji 2,226,000
4 17-Jun-13 matrial/gema /soni 5,000,000
5 20-Jun-13 tukang/bon 350,000
6 25-Jun-13 tukang/bon 1,000,000
7 29-Jun-13 bata merah 8000 buah 6,400,000
8 29-Jun-13 papan 3 ikat /cor/20×20 684,000
9 30-Jun-13 pasir/semen/pipa/kni/papan/ring 1,728,500
10 1-Jul-13 beli/besi/ring/kni/paku/sok 1,318,000
11 3-Jul-13 batu spit/10 saksemen/2 pipa/20 bh kni/ 1,155,000
12 4-Jul-13 pasir 1kol/lem/ p 259,000
13 6-Jul-13 pasir kol / semen 240,000
14 6-Jul-13 pasir kol / semen 240,000
15 7-Jul-13 bayar tukang 2,000,000
16 7-Jul-13 paku /benang 34,000
17 8-Jul-13 pasir 1 engkel 570,000
18 11-Jul-13 pipa/10 tdus/10 kni litrik/pipa 4in/4kni 602,000
19 12-Jul-13 Beli keni, besi, kaso 10 batang 732,000
20 13-Jul-13 setop kontak, kabel, 1 rol 10 bok 2 sklar, 5 benang/5meber 776,000
21 14-Jul-13 bayar material gema/semen/bata 3,743,000
22 15-Jul-13 besi 10 bt, pasir 1 kijang/ semen 5 sak 780,000
23 16-Jul-13 beli bus 2 buah seting 450,000
24 16-Jul-13 pasil 1 engkel 570,000
25 16-Jul-13 pasir 1 kijang 220,000
26 19-Jul-13 biaya gali spiteng 800,000
27 19-Jul-13 uang muka kusen pintu 4,000,000
28 21-Jul-13 bayar Tukang 2,000,000
29 22-Jul-13 Beli Bata merah 3,200,000
30 22-Jul-13 Beli PASIR 1,350,000
31 23-Jul-13 Beli Papan 15 buah 840,000
32 23-Jul-13 Beli Kaso 2 Ikat 330,000
33 23-Jul-13 Beli Bambu 10 batang 150,000
34 25-Jul-13 Biaya pengurusan Izin Operasi TPA 150,000
35 25-Jul-13 biaya cetak Kupon/ tanda terima sumbangan 1,650,000
36 25-Jul-13 bayar Kusen Pintu Tahap II 3,000,000
37 25-Jul-13 Beli paku 3 Kg / Bendrat 2 Kg 78,000
38 28-Jul-13 Beli semen 5 sak 320,000
39 28-Jul-13 Beli Sepanduk pembangunan mesjid 162,000
40 31-Jul-13 bayar tukang 3,000,000
41 30-Jul-13 THR Guru Rp. 600.000,- Buka Rek BJB Rp.100.000,- Operational TPA Rp. 463.000,- 1,163,000
42 16-Aug-13 Cincin besi 15 bt/sorong pasir/1truk 5 kubik 2,571,000
43 16-Aug-13 Alat dapur/tukang/kompor/miji 1 set 545,000
44 16-Aug-13 untuk pesan ust kran2 5,000,000
45 18-Aug-13 Ayakan Pasir / Paku 42,000
46 18-Aug-13 Uangmuka tukang / bon 2,000,000
47 19-Aug-13 paku T 2 sock 2×1 350,000
48 19-Aug-13 papan 20 lembar 20×20 912,000
49 19-Aug-13 Beli Bambu 360,000
50 19-Aug-13 Beli Besi 20bt/B10 + 10 bt/B8 kawat ram 2k b 1,873,000
51 22-Aug-13 Beli paku 4 kg+2kg/triplek 56,000
52 22-Aug-13 Beli Glas Blok 56 buah 1,064,000
53 27-Aug-13 beli pasir 1 kijang +10 sak semen 885,000
54 27-Aug-13 beli pasir 1 truk / 5 kubik 1,350,000
55 27-Aug-13 beli gelas blok silikon 42,000
56 27-Aug-13 beli wavin 4 inc +2 sock 4 inc/4 sak semen 1,250,000
57 27-Aug-13 beli 10 sak semen 645,000
58 27-Aug-13 uang muka tukang / bon pak sukis 1,000,000
59 27-Aug-13 beli selen/kaca kuas semen putih 10 kg 137,000
60 27-Aug-13 biaya dana diknas 200,000
61 4-Sep-13 beli besi 5 bt, +5 sak semen /2 kg benrat 836,000
62 4-Sep-13 bayar pintu kusen tahap III 1,500,000
63 4-Sep-13 uang muka tukang / bon pak sukis 1,500,000
64 7-Sep-13 DP/uang muka / pemasangan baja ringan 4,000,000
65 15-Sep-13 bayar tukang baja ringan 1,500,000
66 13-Sep-13 Beli semen putih 1 sak 90,000
67 16-Sep-13 Ongkos penggalian ke III/LB 900,000
68 17-Sep-13 Beli Paralon 4 inc+3 Inc + 1 sak semen putih 500,000
69 18-Sep-13 Beli batu karang 2 kubik 1,500,000
70 20-Sep-13 Bayar Tukang Bapak Sukis 500,000
71 22-Sep-13 Bayar Tukang Bapak Ebet tahap II 1,500,000
72 23-Sep-13 Beli spit 1/2 kijang 115,000
73 23-Sep-13 Holo/46 galvanis/40X4X2, compon/skrup 2,090,000
74 24-Sep-13 Kable Tbox/solasi/seklar listrik 409,000
75 26-Sep-13 beli paku beton 1 kg 7 cm 40,000
76 26-Sep-13 Bayar Instalasi listrik pak Dayat 100,000
77 26-Sep-13 Bayar Ebit tukang tahap II 500,000
78 20-Sep-13 Bayar lunas Baja Ringan 13,000,000
79 30-Sep-13 Beli Holo/ampelas 315,000
80 2-Oct-13 Bayar Kramik 2,900,000
81 5-Oct-13 Beli lis holo paku 410,000
82 5-Oct-13 beli 10 batang holo 4×4 230,000
83 6-Oct-13 Bayar/ BON tukang / saudara Ebit tahap II 2,000,000
84 10-Oct-13 Beli Holo/ GRC untuk merapikan galian 800,000
85 10-Oct-13 dibayarkan pinjaman kepada RT 06/Uang kramik 6,000,000
86 6-Oct-13 Sumbangan ustad yasin 500,000
87 9-Oct-13 pembelian pasir satu kijang 240,000
88 10-Oct-13 beli kuas cat/bak cat/roll cat 42,000
89 11-Oct-13 beli cat vinilek 1 galon / 25 kg/PCL 495,000
90 11-Oct-13 beli gisen / lis kaca 435,000
91 13-Oct-13 biaya merapikan tanah urukan /galian 100,000
92 14-Oct-13 Bayar/ BON tukang / saudara Ebit tahap II 1,500,000
93 23-Oct-13 beli pasir putih 320,000
94 23-Oct-13 beli lis kornis 1 sak 100,000
95 28-Oct-13 Bayar/ BON tukang / saudara Ebit tahap II 1,000,000
96 1-Dec-13 Bayar Tukang / tim baru/ hamid CS 1,000,000
97 1-Dec-13 Beli kramik 162 dus / untuk dinding 9,071,500
98 4-Dec-13 beli paku , benang, pasir 273,000
99 2-Dec-13 belik sokdrat 20 lim 1/2 kg 115,000
100 6-Dec-13 beli pasir satu kijang 220,000
101 6-Dec-13 BON BAPAK HAMID CS/TUKANG 1,000,000
102 8-Dec-13 beli 10 sak semen 655,000
103 9-Dec-13 BELI PAKU 7 14,000
104 10-Dec-13 PESAN DUA TIANG 200,000
105 11-Dec-13 BON BAPAK HAMID CS/TUKANG 1,000,000
106 12-Dec-13 BELI OKER/KNI/SOK 48,000
107 13-Dec-13 BELI KRAMIK 4 DUS 190,000
108 13-Dec-13 BELI KRAMIK/KLOSET TOTO 5,093,000
109 11-Dec-13 bayar PINTU – PINTU tahap I 5,000,000
110 15-Dec-13 BELI 1 KIJANG PASIR 220,000
111 15-Dec-13 BELI SEMEN OKER KRAMIK 63,000
112 16-Dec-13 BELI KRAMIK 3 DUS 92,500
113 15-Dec-13 BON BAPAK HAMID CS/TUKANG 4,000,000
114 15-Dec-13 BAYAR H HENDRA 4,000,000
115 18-Dec-13 BELI SARINGAN KRAN 217,000
116 18-Dec-13 BELI PSIR DUA KIJANG 18/19 440,000
117 19-Dec-13 BELI SEMEN 10 SAK 660,000
118 19-Dec-13 BELI CLOSET TOTO 3 BUAH 1,110,000
119 22-Dec-13 BON BAPAK HAMID CS/TUKANG 1,000,000
120 24-Dec-13 Cincin besi 15 bt/sorong pasir/1truk 5 kubik 3,500,000
121 24-Dec-13 BAYAR P H. SUGIYO 3,500,000
122 15-Dec-13 BAYAR PINTU 1,000,000
123 15-Dec-13
124 15-Dec-13
125 15-Dec-13
total 167,851,500
167,851,500

Laporan Keuangan Masjid Daarul Uluum Tahun 2014

Laporan keuangan YDU tahun 2014,  total penghimpunan melalui rekening Bank Mumalalat sebesar Rp. 2.350.000,-  dan dana tersebut digunakan untuk operasional masjdi sebesar Rp.1.300.000,-  sehingga total saldo penghimpan dana tahun 2014 sebesar Rp. 1.025.000,-   penghimpunan dana YDU pada rekening Bank Muamalat sebesar tahun 2013  sebesar Rp. 9.550.000,-  mengalami penurunan empat kali) atau sebesar Rp.7.200.000,-sebesar sebagaimana laporan terlampir.

Laporan Keuangan Masjid Daarul Uluum Tahun 2015

Laporan keuangan YDU tahun 2015,  tidak menunjukan  pertumbuhan, karena pada tahun 2015, aktifitas masjid tidak melakukan  pembangunan/ YDU tidak melakukan aktivitas mengingat tahun tersebut masih melakukan konsolidasi internal. pembangunan terakhir adalah pembangunan fisik tempat wudhu.

Laporan Keuangan Masjid Daarul Uluum Tahun 2016

Laporan keuangan YDU tahun 2016,  total penghimpunan melalui rekening Bank Mumalalat sebesar Rp.8.675.000,-  terdiri dari lima transasi masuk / 5 sumbangan hamba Allah dan dana tersebut digunakan untuk tambahan pebelian AC masjid  sebesar Rp.7.000.000,-  sehingga total saldo penghimpan dana tahun 2014 sebesar Rp. 1.570.000,- sebagaimana laporan terlampir.

Laporan Keuangan Masjid Daarul Uluum Tahun 2017

Laporan keuangan YDU tahun 2017,  total penghimpunan melalui rekening Bank Mumalalat sebesar Rp.3.320.000,-  terdiri dari tiga transaksi masuk / 3 sumbangan dari hamba Allah dan beban biaya dministrasi banj dari Januari 2018 hingga desember 2018 (12 bulan)  sebesar Rp.180.000,-  sehingga total saldo penghimpan dana tahun 2014 sebesar Rp. 3.140.000,- sebagaimana laporan terlampir.

Laporan Keuangan Masjid Daarul Uluum Tahun 2018

Laporan keuangan YDU tahun 2018,  total penghimpunan melalui rekening Bank Mumalalat sebesar Rp.37.790.000,-  terdiri dari empat transaksi masuk / 4 sumbangan dari hamba Allah dan digunakan untuk pembelian karpet measjid  sebesar Rp. 30.000.000,- dan beban biaya administrasi bank dari Januari 2018 hingga desember 2018 (12 bulan)  sebesar Rp.180.000,-  sehingga total saldo penghimpan dana tahun 2018 sebesar Rp. 7.610.000,- sebagaimana laporan terlampir.

Laporan Keuangan Masjid Daarul Uluum Tahun 2019

Laporan keuangan YDU tahun 2019,  total penghimpunan melalui rekening Bank Mumalalat tidak mengalami kenaikan  yaitu sebesar saldo awal tahun Rp. 7.610.000,- disebabkan dalam tahun 2019 tidak ada aktifikat penghimpunan, karena tidak ada proyek/pembanguan  yang ditawarkan kepada jamaah,  rencana pembelian tanah wakaf, pembanguan menara yang masih tertunda yang bersifat non teknis, sedangkan transaksi penggunaan dana tanggal 31 januari 2019 untuk tabahan pembanguan pagar masjid Darul Ulllum sebesar Rp.6.000.000,-  dan dan beban biaya administrasi bank dari Januari 2019 hingga desember 2019 (12 bulan)  sebesar Rp.180.000,-

Laporan Keuangan TK Islam Daarul Uluum Tahun 2016/2017

Laporan keuangan TK Islam Daarul Uluum Jatikramat Indah II,  priode bulan Juli 2016 sampai dengan bulan juni 2017 sebesar Rp. 26.768.400,-  terdiri dari sumber penerimaaan SPP dan cicilan PMB, praktek manasik, pemasukan biaya perpisahan, Ijasah dan sumbangan dari DKM.  biaya operasional /penggunaan dana yang dikeluarkan  dalam priode yang sama yaitu seperti fotokopi, honor guru, dan operasional lainnya adalah sebesar Rp. 25.768.400,-  total saldo sebesar Rp. 967.600,- sebagaimana perincian terlampir.

Laporan Keuangan TK Islam Daarul Uluum Tahun 2017/2018

Terlampir laporan keuangan TK Islam Daarul Ullum Jatikramat Indah II,  priode bulan Juli 2017 sampai dengan bulan Juni 2018 sebesar Rp. 27.013.500,-  terdiri dari sumber penerimaaan SPP dan cicilan PMB, praktek manasik, pemasukan biaya perpisahan, Ijasah dan sumbangan dari YDU, DKM.  biaya operasional /penggunaan dana yang dikeluarkan  dalam priode yang sama yaitu seperti fotokopi, honor guru, dan operasional lainnya adalah sebesar Rp. 26.668.510,-  total saldo sebesar Rp. 326990,- sebagaimana perincian terlampir.

Laporan Keuangan TK Islam Daarul Uluum Tahun 2018/2019

Terlampir laporan keuangan TK Islam Daarul Ullum Jatikramat Indah II,  priode bulan Juli 2018 sampai dengan bulan Juni 2018 sebesar Rp. 34.111.000,-  terdiri dari sumber penerimaaan SPP dan cicilan PMB, praktek manasik, pemasukan biaya perpisahan, Ijasah dan sumbangan dari YDU, DKM.  biaya operasional /penggunaan dana yang dikeluarkan  dalam priode yang sama yaitu seperti fotokopi, honor guru, dan operasional lainnya adalah sebesar Rp. 34.183.641,-  total saldo(negatif)  sebesar Rp. 72.641,- sebagaimana perincian terlampir.

Laporan Ratio Keuangan TK Islam Daarul Uluumm Tahun 2016 s/d 2019

  1. Penerimaan dana pada priode tahun 2016 sd 2017 sebesar Rp.26.736.000, dengan priode tahun 2017 sd 2018, sebesar Rp. 27.013.500,- yaitu sebesar Rp.277.000,- mengalami kenaikan  atau pertumbuhan positif dan penerimaan dibandingkan penggunaan dana juga mengalami surplus sebesar Rp.967.600,- hal ini disebabkan penerimaan dapat menekan pada pengeluaran, dan pada pos penerimaan mendapat bantuan / sumbangan DKM, MDU sebesar Rp.1.000.000,- sehingga kondisi keuangan menjadi positif pada priode tersebut.
  2. Penerimaan dan penggunaan dana pada priode tahun 2017 sd 2018 mengalami kenaikan atau pertumbuhan penerimaan positif sebesar Rp.326.990,- kondisinya masih